Shaking incubator installation, precautions and use

Publish Time: 2021-12-30     Origin: Site


1. 简单认识一下产品 Appearance



2. 设备安装及注意事项 Installation and Precautions

安装 Installation 



  1. 安装位置Location and Space Requirements



安装环境:无强烈光照、无强烈腐蚀性气体;安装有合适的通风系统;放置在平稳坚实的地面/平台上;

安装区域:设备后背与墙面间距离应大于10CM,右侧面需要散热在30CM范围内,不得有障碍物遮挡。

The shaking incubator must be situated in a well ventilated area where there is no strong light and hazardous atmosphere. The surface on which the unit is placed must be smooth, level, and able to support the shaker under full load operating conditions.

Allow at least 10cm from the back and 30 cm from the right sight of the shaker to the clear wall. Also allow enough room for the lid to be fully open.


b. 安装环境Environment


温度:35℃以下;相对湿度:<85%RH;

The shaker is designed to operate optimally in the following ambient conditions:

·10 ℃ to 35 ℃

·20 to 85% relative Humidity


c. 电源连接要求Electrical Requirements


AC 110/220±10%, 50Hz-60Hz, Capacity 2Kw


警告 !

当心! 抬起或搬运机器时,机器倾斜不得超过 45 度。

CRUSH WARNING!

Be Careful! When raising or handling the machine.

The machine should not be tilted over 45 degree.


注意事项Precautions


为确保您的摇床保持其吸引人的外观,建议使用带有常规家用清洁剂的布偶尔清洁。 我们还建议清扫摇床周围的区域以清除灰尘和其他碎屑,确保摇床内部和周围的空气流动正常。

To ensure that your shaker retains its attractive appearance, an occasional cleaning, using a cloth with conventional household (non-abrasive) cleaner is recommended.

We also suggest that the area around the shaker be swept to remove dust and other debris, ensuring proper air flow in and around the shaker.


警告! 

清洁和维修设备时,请务必关闭振动台并断开电源线与电源的连接。 

参与清理任何溢出物的人员应戴手套和安全眼镜。

WARNING!

When cleaning and repairing the unit, always turn off the shaker and disconnect the power cord from the power supply.

Personnel involved in the cleanup of any spill should wear gloves, safety glasses. 


 摇床三个月不用或长期在制冷ON模式下工作时,应每两周加热一次,防止受潮。 要做到这一点,请按以下步骤操作: 

1.将温度重置为 40 ℃;

2. 打开盖子,开始加热;

3. 加热时间至少4小时,使水分充分蒸发。

When the shaker not used for three month or long term working on the refrigeration ON mode, should heating it every two weeks to prevent humidity.

To do it as follow steps:

1. Reset the temperature to 40 ℃.

2. Open the lid, making the heating working.

3. The heating time at least 4 hours, make the moisture fully evaporated. 


3. 简单操作 Operation




For any problem or technical support, you may contact us.

Shanghai Zhichu Instrument Co., Ltd.

上海知楚仪器有限公司

TEl:  400-058-0059

Website: www.zhichushakers.com

E-mail: foreigntrade@shzhichu.com

Whatsapp /Skype : +86 18021095480









Shanghai Zhichu Instrument Co., Ltd.

CONTACT US

   Add :Building 37, No.158, Chexin Road, Chedun Town, Songjiang District, Shanghai
   Tel. : +86 2134531721
     E-mail : foreigntrade@shzhichu.com                            info@shzhichu.com
Copyright   Shanghai Zhichu Instrument Co., Ltd.
Sitemap   |   Support By  Leadong